Well-planned New Year office décor boosts staff engagement, generates UGC, and improves visitor impressions at peak season. In 2025, companies in Tashkent increasingly choose modular solutions with fast installation, energy-efficient lighting and safe electrics — all delivered turnkey by the FocusAds team.
What the ready packages include — 7 steps
- Brief & goals. KPIs: reach, visits, UGC; deadline and budget.
- Office inspection. Measurements, power points, clearances, evacuation routes.
- Concept/moodboard. Palette, CMF, brand-guide compliance.
- 3D render & approval. 1–2 options, edits, final.
- Estimate & timeline. Installation SLA, risks, buffers.
- Production & commissioning. Print/cut/assembly; CRI/lumen and IP-class control.
- Installation, dismantling & storage. Labeling, crates, reuse regulations.
Packages and timeline/budget benchmarks
Package | What’s included | Timeline, days | Benchmark, UZS |
Basic office | Garlands, 1 photo zone, minimal branding | 3–5 | ≈ 6–9 mln |
Standard office | 3D accent, brand wall, dynamic lighting | 5–7 | ≈ 12–18 mln |
Premium office | Zoning, neon, several photo zones | 7–10 | ≈ 18–35 mln |
Façade + entry | IP65, brackets, energy control, safe fixings | 10–15 | ≈ 30–60 mln |
Benchmarks for the Tashkent market (Q4-2025); final cost depends on area, height, electrics and venue regulations.
10 current office-décor trends
- Monochrome + accent. Balanced palettes with “icy” tones and a vivid highlight.
- Interactive photo zones. Reels/Stories spots right by reception/lounge.
- Dynamic lighting. Scenes, dimming, timers; lower costs — bigger “wow.”
- Eco-materials & reuse. Modularity cuts TCO and speeds installation.
- Neon accents. Compact, eye-catching, safe when installed properly.
- Print + 3D. Cost/impact balance for workspaces.
- Warm-white temperature. Proper CRI/lumens for a “premium” light feel.
- Electrical safety. Cable management, RCDs, IP65 at the entry group.
- Mini-décor for work areas. Subtle — no visual overload.
- Micro photo zones for teambuilding. Strengthens employer branding.
See the full list of options in services.
“In 3 days”: step-by-step launch
- Day 0–1. Express brief, measurements via photos/video, concept prototype.
- Day 1–2. 3D render (1–2 options), estimate, approval, materials pre-order.
- Day 2–3. Production, night installation, commissioning, photo/video handover, care guidelines.
Real case studies
- Case 1 (office 250–300 m²). Task → Solution → Result (UGC/visits).
- Case 2 (open-space). Dimming + lighting scenes = savings and comfort.
- Case 3 (entry group). IP65, fast approvals, safe installation.
Ready to discuss your site? Leave an application for a free measurement visit.
Our in-house research
Period: late September — early October 2025.
Method:
- Seasonality of interest in Uzbekistan — Google Ads (last 90 days) for “New Year office décor,” “New Year decoration.”
- Query wordings & volumes — Yandex.Wordstat (Tashkent slice).
- Mini-survey of office managers (N=15–30): formats, budgets, deadlines.
- Internal benchmark across 5–10 office locations: solutions, energy use, clearances.
Findings. Interest peaks in late September — early October; the share of “office photo zone” and “fast installation” queries grows. Dimming and modularity deliver maximum impact with minimal time.
Tashkent regional specifics
- Materials & climate. Dust/temperature swings → choose durable coatings and fixings.
- Electrics & IP classes. For the entry group — at least IP65; RCDs and load tests.
- Logistics/access. Night installation windows, BC passes; storage for reuse.
FAQ
- How long is “turnkey”? Office 3–7 days, entry group 10–15.
- Can it be done without drilling? Yes — removable fixings/double-sided systems.
- What’s the power consumption? LED with dimmers and timers reduces usage.
- Are materials safe? We use fire-retardant fabrics and certified cables.
- If the power goes out? We plan scenarios and autonomous photo zones.
- Who handles dismantling/storage? Included in the package with a handover guideline.
Data sources
Bottom line
In 2025, modular, energy-efficient and safe solutions win — they install quickly and generate UGC. Order the concept and 3D visualization to receive an estimate and timing within 48 hours — and secure the nearest night installation windows in Tashkent.